Food Prep / Clean Room ,
Kirton Holme
Works have recently been completed to a new food preparation and packing facility at Holme Farm, near Boston.
Works included strengthening of the existing steel framed structure; introduction of oven pits; white walling and mezzanine floor.
Further works are now underway to construct a linkway between this new process facility and the existing chill stores. |